Technical specifications

Scope of works:

  • Twin-tube road tunnel under the River Thames, 2 x 1,400 m long,
  • internal diameter 10.66 m, external diameter 11.45 m
  • Access ramps, 600 m in length
  • 8 cross-passages
  • Service buildings at both tunnel portals
  • 1 new footbridge
  • 1 new overbridge for the southbound carriageway of the Blackwall Tunnel

Construction method:

  • TBM tunnelling using an EPB TBM, 2 x 1,120 m
  • TBM diameter 11.8 m,
  • Twith steel fibre reinforced segmental lining,
  • Construction of cross-passages using ground freezing and sprayed concrete lining including rebar reinforded concrete secondary lining, 300 m cut and cover tunnel

Geology

  • London Clay, dense sands of the Lambeth Group, dense gravels of the Harwich Formation, River Terrace Deposits

General data

Project
Silvertown Tunnel, London, United Kingdom

Client

Transport for London (TfL), London, United Kingdom

Contractor

Wayss & Freytag Ingenieurbau AG in a Joint Venture

Construction period

2019 to 2025

Construction costs
GBP 945 million

Utilisation
WInfrastructure
Type
Road tunnel
Length
2,800 m
Construction Method
Tunnelling using an EPB TBM
Related Projects

Related Projects

Crossrail Western Tunnels
Crossrail Western Tunnels
Great Britain

Upgrade for London’s Wastewater System

Read more
ElbX Elbe Crossing Structure - tunnel driving
ElbX Elbe Crossing Structure - tunnel driving
Germany

Due to swelling events and the associated heave and damage to the tunnel inner lining, it was planned to install protective netting in the area of the tunnel roof and the upper side walls.

Read more
Weser crossing
Weser crossing
Germany

1 four-lane motorway tunnel, total tunnel length 1,100 m, length of total section on our behalf approx. 4,800m.

Read more